Capturing Union Pacific along the Columbia Gorge is a more difficult task than getting shots of BNSF. The Oregon side is limited by I-84, making stops and turnarounds tough, and foliage west of Th... (more)
A UP visitor is passing under a Sante Fe era signal bridge on the Marceline sub. These signal bridges are slowly disappearing. Interesting to note that both Main 1 and Main 2 were laid here in 1... (more)
UP 5028 and 3942 await an empty at Little Lake, as soon as it arrives and clears the 5028 job will be off to Escanaba with this loaded train.
Auto Rack Train 451 pulls the grade to C.P. McAllister at the east end of the CN Yard in Battle Creek.
UP train heads west through Chem.
Rack train Q204 rolls north over the flood plain south of Evansville.
Westbound freight waiting for a Westbound coal train to clear